Construction USS Kentucky (BB-66)



the hull of incomplete kentucky floated out of drydock in 1950 allow uss missouri (bb-63) drydock repairs


because iowa-class torpedo defense virtually same preceding south dakota-class battleships proposed kentucky s hull redesigned provide greater degree of torpedo protection battleship. under original construction schematics class each side of ship protected below waterline 2 tanks mounted outside belt armor, , separated bulkhead. these tanks planned empty, in practice filled water or fuel oil. armored belt tapered thickness of 4 inches (100 mm) below waterline. behind armored belt there void, , bulkhead. outer hull intended detonate torpedo, outer 2 compartments absorbing shock , splinters or debris being stopped armored belt , empty compartment behind it. in 1939 navy discovered system considerably less effective earlier torpedo defense systems, , such intended construction format kentucky have addressed problem providing 20% improvement torpedo defense of battleship while simultaneously reducing flooding in event of torpedo strike. despite providing additional torpedo defense kentucky records unclear on matter of whether or not idea adopted.


kentucky s construction plagued suspensions. keel laid down @ norfolk navy yard, portsmouth, virginia, on 7 march 1942. however, work on ship suspended in june year, , kentucky s bottom structure launched make room lst construction on 10 june. while construction suspended, bureau of ships considered aircraft carrier conversion proposal kentucky , illinois in aftermath of battles of coral sea , midway. proposed, converted kentucky have had 864-foot (263 m) long 108-foot (33 m) wide flight deck, armament identical carriers of essex class: 4 twin 5-inch gun mounts , 4 more 5-inch guns in single mounts, along 6 40 mm quadruple mounts. idea abandoned after bureau of ships decided converted ships carry fewer aircraft essex class, more essex-class carriers built in same amount of time, , conversion project more expensive new essexes. instead, kentucky , illinois completed battleships, construction given low priority. work on ship resumed on 6 december 1944, when keel structure returned slipway. work on battleship proceeded @ slow pace, , completion projected third quarter of 1946. in december 1945 recommended kentucky completed anti-aircraft battleship, , work on ship suspended in august 1946 while considered. construction resumed again on 17 august 1948 without decision having been made on final design. work on kentucky continued until 20 january 1950, when decided halt work on ship. following this, floated out of drydock clear space repairs sister ship missouri, had run aground en route hampton roads.








Comments

Popular posts from this blog

Mobility.2C training and insignia Impi

Expenses controversy Ian Gibson (politician)

11th century parish church of St Leonard Hythe, Kent